With an A-rated building, a neat front yard, a nearly invisible wind turbine, and 99 solar panels on the roof, the company can already be called very green. A hydrogen bus has also been ordered for logistics in the city center. However, that doesn’t mean it’s time to sit back and relax. Remco Swaab, director of the construction company, explains: “We have a mission: to work together on the living environment of tomorrow. We’re thinking long-term. I always say that I try to leave the world in better shape than I found it. That’s quite a challenge.”
At the company, they deal daily with the Trias Energetica, a three-step strategy for energy-efficient design. Sustainability, however, is about more than just energy efficiency. So a little extra advice never hurts. That’s why the company is reaching out to the municipality for what’s known as “green advice.” The goal? To make the development site more sustainable. First, they considered a green roof, but that turned out to be a step too far for this building on the Hoef. Swaab: “We’d have to renovate so much that it would no longer be sustainable.” That’s why other options were quickly explored. What about infiltration crates? “By burying 12 cubic meters of crates in the ground, the water will eventually have time to seep into the soil. We’ll also install a separate three-cubic-meter tank with a pump system. We’ll use that to water the plants in our garden. That saves a lot of tap water.”
Huurdeman’s neatly maintained green yew hedges immediately catch the eye upon arrival. Yet, as the landscaping report shows, there is still room for improvement. “The boxwood hedges will stay, but new plants will be added among them—plants that would normally grow here if you let nature take its course. This, in turn, creates a better balance among organisms and insects in the area. As humans, we often search for a utopia—a solution to everything that’s wrong—but that doesn’t exist. Nature is a system where everything is interconnected; if you remove something from it, things go wrong. If we just let that all happen, it will only get worse.” The next step is to partially repave the site with grass pavers made from recycled plastic. The company is ready to move forward with the project, but must wait until just after summer to ensure optimal planting conditions.
At A. Huurdeman, they say they’ve always been committed to the development of the community and its people. “Although for a long time we thought we were already doing everything. We just didn’t talk about it,” says Swaab. Now it’s five minutes to midnight, and they’ve
last point. “We’ve learned that it’s important to share this, in the hope that fellow entrepreneurs will see it as a good idea and start making their businesses more sustainable, too. We really need to all work together on this. Otherwise, we won’t meet the climate goals.”